Form TP-01 · Cover Letter & Compliance Statement

Cover Letter and Compliance & Undertaking Statement

Print on company letterhead and sign by the authorised representative. This is the only document the evaluation committee reads before it opens anything else.

Tender no.—
Project—
Submission date—
CopiesOriginal + 1
Why this form decides the rest: an unsigned cover letter, a missing bid bond reference or a qualification hidden in a footnote is an administrative rejection before technical scoring begins. Complete every field, and list every deviation in Form TP-12 rather than in this letter.

1 Bidder Particulars

2 Tender Particulars

3 Letter

Subject: Submission of Technical and Financial Proposal for   — Tender No.  

Dear Sir / Madam,

Having examined the Instructions to Bidders, the General and Particular Conditions of Contract, the Specifications, the Bill of Quantities, the Drawings and all addenda issued in respect of the above tender, and having visited the site and obtained all information necessary for the preparation of this offer, we, the undersigned, submit our technical and financial proposal for the execution and completion of the Works and the remedying of any defects therein.

We confirm that we have read and understood the complete tender documents, including every addendum and clarification issued, and that this offer is based on a full understanding of the scope of work and of the site conditions prevailing at the location of the Works.

We undertake to execute and complete the Works in accordance with the Specifications, Drawings and Bill of Quantities, to the quality standard required, for the total tender sum and within the programme stated in the financial offer and the time schedule appended hereto, and in any event within the period stated in the Instructions to Bidders.

We confirm that all documents and information submitted with this offer are true and accurate, and that any misstatement or concealment entitles the Employer to reject the offer or to take such other action as the contract permits.

This offer shall remain valid for the period stated in Section 2 above from the deadline for submission, and we undertake to furnish a performance security in the amount and form and on the terms set out in the Conditions of Contract should the award be made to us.

We understand that the Employer is not bound to accept the lowest or any offer, and that no cost incurred in the preparation of this offer will be reimbursed.

We remain at your disposal for any clarification or clarification meeting you consider appropriate.

Yours faithfully,

Name — block capitals
Position
Date
Company stamp

4 Compliance & Undertaking Statement

State the bidder's position against each heading. Any departure from the specification must be recorded in the Deviations schedule (Form TP-12) and cross-referenced here — a departure that appears only in this table and not in TP-12 will be treated as an unqualified offer.

#Requirement in the tender documentsPositionReference / remarks
1Full compliance with the general and particular technical specificationsComply Comply w/ note Depart
2Compliance with the Bill of Quantities without altering items or unitsComply Comply w/ note Depart
3Compliance with the stated construction period and programme requirementsComply Comply w/ note Depart
4Compliance with quality control, inspection and testing requirementsComply Comply w/ note Depart
5Compliance with health, safety and environmental requirementsComply Comply w/ note Depart
6Acceptance of the general and particular conditions of contract without qualificationComply Comply w/ note Depart
7Provision of the warranties, guarantees and insurances requiredComply Comply w/ note Depart
8Compliance with any stated material brands, rates or provisional sumsComply Comply w/ note Depart
9Acceptance of the stated period for approval of materials and shop drawingsComply Comply w/ note Depart
10Acceptance of the defects liability and warranty periodComply Comply w/ note Depart
11Acceptance of the liquidated damages regime stated in the contractComply Comply w/ note Depart
12Confirmation that the tender sum includes all duties, taxes and levies applicableComply Comply w/ note Depart

General declaration

We, the undersigned, declare that all information, data and documents contained in this offer are true and accurate; that we possess the technical, financial and organisational capability required to execute the Works; and that we have not knowingly included any misleading or incomplete information intended to affect the award decision. We understand that any breach of this declaration exposes us to legal liability and to exclusion from the tender.

NamePositionSignatureDate