Fillable, printable and internally reconciling. The take-off feeds the price schedule, the price schedule feeds the payment ladder, and the last review catches the inconsistency before the client does.
| Code | Document | Role | Scope |
|---|---|---|---|
| TP-01 | Cover Letter & Compliance Statement | Submission | Signed undertaking plus a twelve-line compliance matrix mapped to the tender requirements. |
| TP-02 | Scope Understanding & Methodology | Technical | Nine work packages, six-step execution sequence, coordination and clash management. |
| TP-03 | Time Schedule & Payment Schedule | Technical | Fourteen-activity bar chart over twelve months, six milestones and the payment ladder. |
| TP-04 | QA/QC Plan | Technical | Twelve-point inspection and test plan with hold points, NCR procedure and KPI targets. |
| TP-05 | HSE Plan | Technical | Ten critical hazards, PPE schedule, six permit types and emergency response. |
| TP-06 | Resource Plan | Technical | Organisation chart, key personnel schedule, fourteen plant items, ten material sources. |
| TP-07 | Track Record & Similar Projects | Qualification | Ten project slots, detail sheets, and an experience matrix against the stated minimums. |
| TP-08 | Risk Register & Mitigation | Technical | Fourteen risks on a 5×5 matrix with triggers, owners and costed contingencies. |
| TP-09 | BOQ Summary & Price Schedule | Commercial | Twenty-four items, waste per row, overhead and profit as visible lines, four currencies. |
| TP-10–13 | Supporting Forms | Administrative | Tender checklist, RFI, deviations and value engineering, handover warranty. |
| TP-G1 | Drawing Reading Guide | Guide | Architectural, structural and MEP: symbols, bar schedules, risers, cross-checks. |
| TP-14 | Quantity Take-off & Summary | Commercial | Dimensions in, quantities out: nine work groups, waste by material, live totals. |
| TP-G2 | How to Use the Kit | Guide | The order of work, the quantity-to-price chain and a fifteen-point pre-submission review. |
The rates. Every unit rate in TP-09 is illustrative — it demonstrates the arithmetic and is not
a market price. Replace all twenty-four with live supplier or subcontract quotations.
The people and projects. Every CV, client and reference in TP-06 and TP-07 must be real and
verifiable. A reference the evaluator cannot reach is worse than no reference.