MMC Technical Proposal Kit · English Edition

Thirteen Tender Documents, One Set of Numbers

Fillable, printable and internally reconciling. The take-off feeds the price schedule, the price schedule feeds the payment ladder, and the last review catches the inconsistency before the client does.

Documents13
Guides2
Sheets2
Version2.0
Read this page, then open TP-G2 first. The kit is not thirteen independent forms — it is one offer expressed thirteen ways. Filling them out of sequence is how offers end up saying three different things about the same total.

01 Document Catalogue

CodeDocument RoleScope
TP-01Cover Letter & Compliance StatementSubmissionSigned undertaking plus a twelve-line compliance matrix mapped to the tender requirements.
TP-02Scope Understanding & MethodologyTechnicalNine work packages, six-step execution sequence, coordination and clash management.
TP-03Time Schedule & Payment ScheduleTechnicalFourteen-activity bar chart over twelve months, six milestones and the payment ladder.
TP-04QA/QC PlanTechnicalTwelve-point inspection and test plan with hold points, NCR procedure and KPI targets.
TP-05HSE PlanTechnicalTen critical hazards, PPE schedule, six permit types and emergency response.
TP-06Resource PlanTechnicalOrganisation chart, key personnel schedule, fourteen plant items, ten material sources.
TP-07Track Record & Similar ProjectsQualificationTen project slots, detail sheets, and an experience matrix against the stated minimums.
TP-08Risk Register & MitigationTechnicalFourteen risks on a 5×5 matrix with triggers, owners and costed contingencies.
TP-09BOQ Summary & Price ScheduleCommercialTwenty-four items, waste per row, overhead and profit as visible lines, four currencies.
TP-10–13Supporting FormsAdministrativeTender checklist, RFI, deviations and value engineering, handover warranty.
TP-G1Drawing Reading GuideGuideArchitectural, structural and MEP: symbols, bar schedules, risers, cross-checks.
TP-14Quantity Take-off & SummaryCommercialDimensions in, quantities out: nine work groups, waste by material, live totals.
TP-G2How to Use the KitGuideThe order of work, the quantity-to-price chain and a fifteen-point pre-submission review.

02 The Chain That Has to Hold

TP-14
Measure
L × W × H × No., waste per material
TP-14
Summarise
Nine group subtotals
TP-09
Price
Rate per item, plus overhead and profit
TP-03
Distribute
Payment % per milestone
TP-01
Declare
One figure, stated once

Two things you must change before submitting

The rates. Every unit rate in TP-09 is illustrative — it demonstrates the arithmetic and is not a market price. Replace all twenty-four with live supplier or subcontract quotations.
The people and projects. Every CV, client and reference in TP-06 and TP-07 must be real and verifiable. A reference the evaluator cannot reach is worse than no reference.

03 Using the Pages

04 Also Available

OVERVIEW
What the kit is and who it is for
The problem it solves, the documents it contains, and what the pages look like.
PRICING
Starter, Professional, Enterprise
Monthly or annual, with the reasoning behind where the tiers are drawn.
COMPARE
Full feature matrix
Exactly what differs between the three plans, with nothing hidden in an add-on.
FAQ
Questions contractors ask first
The forms, the numbers, billing, data privacy, editions and support.