The four forms that prevent the most common causes of rejection, dispute and unpaid closeout claims.
Tick each item before packing. A missing mandatory item is an administrative rejection that no technical score can recover.
| # | Document / requirement | Type | Status | Owner | Notes |
|---|---|---|---|---|---|
| 1 | Signed and stamped cover letter | Mandatory | |||
| 2 | Bid bond / tender security | Mandatory | |||
| 3 | Commercial registration | Mandatory | |||
| 4 | Contractor classification certificate | Mandatory | |||
| 5 | Contractors' association membership | Mandatory | |||
| 6 | Social security clearance | Mandatory | |||
| 7 | Tax compliance certificate | Mandatory | |||
| 8 | Methodology and scope understanding (TP-02) | Mandatory | |||
| 9 | Time schedule and bar chart (TP-03) | Mandatory | |||
| 10 | QA/QC plan (TP-04) | Mandatory | |||
| 11 | HSE plan (TP-05) | Mandatory | |||
| 12 | Organisation chart and CVs (TP-06) | Scored | |||
| 13 | Equipment schedule (TP-06) | Scored | |||
| 14 | Track record and certificates (TP-07) | Scored | |||
| 15 | Risk register (TP-08) | Scored | |||
| 16 | Priced BOQ, all items and totals (TP-09) | Mandatory | |||
| 17 | Financial offer letter | Mandatory | |||
| 18 | Deviations / qualifications schedule (TP-12) | Scored | |||
| 19 | Audited financial statements, 3 years | Mandatory | |||
| 20 | Bank reference / line of credit | Scored | |||
| 21 | ISO certificates with scope | Scored | |||
| 22 | Addenda acknowledgement | Mandatory |
Count the copies, confirm the original is marked as such, check every signature and stamp, verify that the pricing in words and figures agree, and confirm the submission address and time. Late is late — there is no discretion, and a courier timestamp is not the Employer's clock.
| RFI no. | Subject | Date raised | Response due | Response date | Status |
|---|---|---|---|---|---|
One question per RFI. A document with six questions gets one answer to three of them. Closing date for questions is stated in the instructions — an RFI raised after that date will not be answered and its subject becomes your risk at the price you bid.
Record every departure from the specification, and every alternative you propose with its saving. An unlisted departure is deemed included at no extra cost.
| # | Specification clause | Requirement | Bidder's proposal | Reason | Cost effect | Time effect |
|---|---|---|---|---|---|---|
| 1 | ||||||
| 2 | ||||||
| 3 | ||||||
| 4 |
| # | Element | Specified solution | Proposed alternative | Saving | Effect on performance / warranty |
|---|---|---|---|---|---|
| 1 | |||||
| 2 | |||||
| 3 |
A value engineering proposal is accepted on three conditions: it does not reduce performance or design life, it carries an equivalent or better warranty, and the saving is shared or passed on as the contract requires. A proposal that offers a saving but weakens the specification will be rejected and will damage the credibility of your other submissions.
| Element / system | Warranty period | Provider | Document reference | Attached |
|---|---|---|---|---|
| Structural works | 10 years (or as specified) | Contractor | ||
| Waterproofing / roofing | 10 years | Manufacturer + applicator | ||
| External envelope / glazing | 5 years | Manufacturer | ||
| Mechanical / HVAC equipment | 24 months | Manufacturer | ||
| Electrical installations | 24 months | Contractor | ||
| Fire detection & protection | 24 months | Manufacturer + contractor | ||
| Lifts | 24 months | Manufacturer | ||
| Finishes | 12 months | Contractor | ||
| Joinery & ironmongery | 12 months | Manufacturer |
| Document handed over | Copies | Format | Date |
|---|---|---|---|
| As-built drawings | 2 + PDF | DWG + PDF | |
| O&M manuals | 2 + PDF | Hard + PDF | |
| Warranty certificates | 1 set | Hard + PDF | |
| Test and commissioning reports | 1 set | ||
| Spare parts & attic stock | As scheduled | Physical | |
| Keys and access cards | As scheduled | Physical + register | |
| Training records | 1 set | Signed attendance |