Form TP-07 · Track Record & Similar Projects

Track Record and Similar Projects

Similar means similar in type, size, complexity and delivery model — not merely large. Each entry must be verifiable by a third party without contacting the bidder.

Sections5
Project slots10
VerificationCertificates
Rev.A
Test for every entry: would the evaluator accept this as relevant to the works being tendered? If the project is a different building type, state the transferable element explicitly — the same structural system, the same MEP complexity, the same live-environment constraints.

1 Company Profile

2 Similar Projects Completed

#Project & locationClient / consultantTypeContract valueYearDurationRole
1Main contractor
2Main contractor
3Main contractor
4Main contractor
5Main contractor
6Joint venture
7Main contractor
8Main contractor
9Main contractor
10Main contractor

3 Project Detail Sheets

Complete one sheet for each of the three most relevant projects. " These are the entries the evaluator will actually read.

4 Experience Compliance

Requirement in the tenderStated minimumBidder's positionEvidence reference
Years of experience in similar works
Number of similar projects completed
Largest single contract value
Annual turnover threshold
Key personnel experience
Local registration / classification
ISO 9001 certification
ISO 45001 / OHSAS certification
ISO 14001 certification

5 Certificates and References

DocumentIssuerReference no.Date / expiryAttached
Contracts manager
Project director