Thirteen fillable tender forms, a drawing-reading guide and a quantity take-off sheet that calculates itself โ built for contractors who lose work to administrative rejection and arithmetic that does not reconcile.
Technical evaluation is a scoring exercise with a gate in front of it. Contractors spend weeks on the price and an afternoon on the submission โ then discover the gate was the whole competition.
An expired certificate, a missing bond reference, an unsigned page. The technical score never gets read, and nobody tells you why.
The cover letter says one figure, the BOQ another, the payment schedule implies a third. The evaluator queries it, and confidence in the whole offer drops.
The same twelve pages submitted to every tender. Evaluators score it against the actual scope, and a document that could describe any project describes none.
The quantity take-off feeds the price schedule; the price schedule feeds the payment ladder; the payment ladder has to be defensible from the BOQ groups. The kit is built so those links are arithmetic, not promises โ and so the last review catches the inconsistency before the client does.
Signed undertaking plus a twelve-line compliance matrix mapped to the tender requirements.
Nine work packages, four execution gates, coordination and clash management.
Twelve-month bar chart, six milestones, payment percentages that follow the BOQ.
Twelve-point inspection and test plan with hold points, NCR procedure, KPI targets.
Ten critical hazards, PPE schedule, six permit types, emergency response.
Organisation chart, key personnel schedule, fourteen plant items, ten material sources.
Ten project slots, detail sheets, experience compliance against stated minimums.
Fourteen risks with 5×5 matrix, trigger conditions, owners and contingencies.
Twenty-four items, waste per row, overhead and profit as separate lines.
Tender checklist, RFI, deviations and value engineering, handover warranty.
Architectural, structural and MEP: symbols, bar schedules, risers, cross-checks.
The order of work, how quantities link to prices, and a fifteen-point pre-submission review.
Clean, print-first layouts. Every form is a page you could hand to a client without reformatting.
These are illustrative examples written for this prototype, not real customer testimonials. They show the kind of feedback the kit is designed to earn.
โThe payment ladder was the part that changed how we bid. We used to invent the percentages; now they fall out of the BOQ and we can defend every one of them.โ
โWe stopped losing bids at the administrative stage. The checklist with an owner against every line is the least glamorous and most useful page in the pack.โ
โThe take-off sheet made our reinforcement quantity traceable. When a client queries a figure we can point at the row, the drawing and the revision.โ
Either. The HTML forms calculate in the browser and print directly to PDF. The Excel workbook is for firms who want to keep the take-off as a working file and update dimensions later without reprinting the page.
No, and the document says so on the page. The unit rates in the price schedule are illustrative โ they exist to show the arithmetic from take-off to offer value. They must be replaced with live supplier quotations before submission. The quantities are derived from declared geometry and can be checked by hand.
On Professional and Enterprise. Starter prints with the kit's own header so that branding remains the reason to move up a tier.
Yes โ the Arabic edition is a full RTL version of all thirteen documents, with the same calculations and the same cross-checks. It is included in Professional and Enterprise.
Forms are versioned and corrected; corrections are part of what the subscription pays for. Enterprise subscribers also receive the quarterly code-change brief.
Because in a scored technical evaluation, it is. Open the preview, print one form, and see whether it is better than the one you are using now.
Subscribe to Professional Compare plans