Thirteen fillable tender documents, a drawing-reading guide and a self-calculating quantity take-off — in English and Arabic, with a subscription layer for commercial distribution.
Choose the appropriate workspace for tenders and services. The procurement portal is permanently free.
Each row links to the same document in each language. The tag shows the document's role in the submission.
If nothing happens on a phone, open this page in Safari or Chrome (not an in-app browser) and tap the card again. The file downloads as .xlsx and opens in Excel, Numbers or Google Sheets. · إن لم يحدث شيء على الجوال فافتح الصفحة في Safari أو Chrome مباشرة، وليس من داخل تطبيق آخر.
The documents above are complete on their own. The packages add the second edition, the Excel workbook, your own branding and support — and fund the maintenance of the forms. The portal applies the same limits: active tenders and upload space.
One tender, 25 MB upload, try the whole flow
One seat, one language, three projects
Both editions, Excel workbook, your branding
Unlimited seats, custom forms, named support
| What differs between packages | Free Trial | Starter | Professional | Enterprise |
|---|---|---|---|---|
| Active tenders in the portal | 1 | 3 | 15 | unlimited |
| Upload space | 25 MB | 200 MB | 1 GB | unlimited |
| All 13 forms, both guides and the take-off | ✓ | ✓ | ✓ | ✓ |
| English edition | ✓ | ✓ | ✓ | ✓ |
| Arabic edition (RTL) | — | ✓ | ✓ | ✓ |
| Excel workbook | — | ✓ | ✓ | ✓ |
| Your logo on the forms | — | — | ✓ | ✓ |
| Users / seats | 1 | 1 | 5 | unlimited |
| Support | — | — | 1 business day | 4 hours, named manager |
| Custom forms to your tender format | — | — | — | ✓ |
🔓 Open MMC Portal Sign in Subscribe Full pricing Compare plans FAQ
The portal is no longer a browser-only prototype. It now runs on a real Node/Express server with a SQLite database, bcrypt password hashing and JWT sessions in an httpOnly cookie. Tenders, uploaded files and requests are stored server-side and follow your account across devices, and plan limits are enforced by the server. Project verification: 54/54 integration tests and 35/35 live curl checks pass. Run it with cd server && npm install && npm run migrate && npm start — see server/README.md.
Not yet implemented: automated drawing/PDF quantity extraction (outputs are built from the templates plus tender data), payment (plan changes write straight to the database), and notifications.
Files no longer live only on the server disk. A single abstraction with two drivers — local disk and any S3-compatible cloud (AWS S3, Cloudflare R2, MinIO) — is selected by one variable: STORAGE_DRIVER=local|s3. Every upload is stored under users/<id>/tenders/<id>/<uuid>.<ext> and recorded with its SHA-256 checksum and driver, so downloads are served by short-lived signed URLs (5 minutes) only after ownership is verified. A migration script moves existing files to the cloud, verifying the checksum of each object after upload and never deleting the local copy unless you pass --delete-local.
Database backups use SQLite's VACUUM INTO — a consistent copy taken inside a read transaction, safe while the server is running, never a raw file copy. Each backup is gzipped, checksummed, verified by integrity_check and per-table row counts, then uploaded to backups/db/YYYY/MM/ with retention of 7 daily + 4 weekly + 12 monthly. Scheduling runs in-process on node-cron, each run in an isolated child process, and is disabled with SCHEDULER_ENABLED=false. Restore verifies both checksums, compares every table's row count against the manifest, and refuses to overwrite in place without --yes.
Project verification: 54/54 Phase 1 tests still pass, plus 11/11 S3 tests against a live S3-compatible endpoint. An actual backup was restored and all seven tables matched row-for-row. Run the migration and backups with node scripts/migrate-to-cloud.js and node scripts/backup.js — see README.md section 11 for exactly what was not tested against real AWS S3 or R2.