M MMC Technical Proposal Kit
TP-KIT v4.0
تسجيل الدخول / Sign in إنشاء حساب / Register 🔓 MMC Portal Tender opportunities Overview Pricing Compare FAQ Subscribe
AR EN
MMC Technical Proposal Kit · Bilingual Edition

MMC Technical Proposal Kit — Bilingual Index

Thirteen fillable tender documents, a drawing-reading guide and a self-calculating quantity take-off — in English and Arabic, with a subscription layer for commercial distribution.

Documents13 × 2 editions
Version2.0
CurrencyUSD / JOD / SAR / AED / AUD / GBP / EUR
Packages3 tiers

00 System portals before launch

Choose the appropriate workspace for tenders and services. The procurement portal is permanently free.

MMC DEMO PRESENTER · SECURE ACCESS
MMC Demo Presenter — Unified Workspace
Open the dedicated presentation account and access the five MMC workspaces from one page. Isolated demonstration environment; no production data access.
CONTRACTOR PORTAL
Contractor portal
Register, choose a plan, create an invoice, upload a transfer receipt and track activation.
PROCUREMENT PORTAL · FREE
Procurement portal — always free
All core procurement functions are permanently free, with no subscription or trial period.
CONSULTANT PORTAL
Consulting office portal
MMC VENDOR & SERVICE PROVIDER REGISTRY · EN / AR
Vendor & Service Provider Registry — سجل الموردين ومقدمي الخدمات
Central company registration for contractors, suppliers, manufacturers, consultants, equipment providers and specialist service companies. One company profile, with independent qualification by each Procurement or Consultant entity. · تسجيل مركزي للشركات مع تأهيل مستقل لدى كل جهة مشتريات أو مكتب استشاري.
INTERNATIONAL CONTRACTORS DIRECTORY · EN / AR
International Contractors Directory — دليل المقاولين الدولي
Search official contractors’ associations, unions and member directories in Jordan, Saudi Arabia, Qatar, the UAE, Australia, the United Kingdom and European countries. · البحث عن المقاولين عبر النقابات والاتحادات والأدلة المهنية الرسمية في الأردن والسعودية وقطر والإمارات وأستراليا وبريطانيا ودول أوروبا.
MMC AI CONSTRUCTION INTELLIGENCE
MMC AI — Construction Intelligence
Independent AI workspace for drawing analysis, quantity takeoff, BIM, schedules, contracts and project risk. Preview interface; engineering engines are under development.
SYSTEM GUIDE · PDF · EN / AR
MMC System Guide — Four Portals
One bilingual PDF explaining the Contractor, Procurement, Administration and MMC-AI workspaces. The guide is kept here on the homepage.
ADMIN PORTAL
Administration portal
Review payment receipts, approve or reject invoices and activate plans with an expiry date.
Start here. Both editions carry the same thirteen documents and the same arithmetic. Choose a language below, then follow the documents in order — the usage guide (TP-G2) explains the sequence and the fifteen checks to run before submission.

01 Choose your edition

ENGLISH English Edition — LTR Full set of 13 documents, ISO-style terminology, USD / JOD / SAR / AED / AUD / GBP / EUR switching, English number and date formats. العربية النسخة العربية — RTL جميع المستندات الثلاثة عشر، مع المصطلحات الفنية بالإنجليزية بين قوسين، والتنسيق من اليمين إلى اليسار.

02 Document index — both editions

Each row links to the same document in each language. The tag shows the document's role in the submission.

Code English العربية Role Open
TP-01 Cover Letter & Compliance Statement خطاب التقديم وإقرار المطابقة التقديم EN AR
TP-02 Scope Understanding & Methodology فهم نطاق العمل والمنهجية فني EN AR
TP-03 Time Schedule & Payment Schedule البرنامج الزمني وجدول الدفعات فني EN AR
TP-04 QA/QC Plan خطة الجودة فني EN AR
TP-05 HSE Plan خطة السلامة والصحة المهنية فني EN AR
TP-06 Resource Plan: Organisation, CVs, Plant, Materials خطة الموارد: الهيكل والسير الذاتية والمعدات والمواد فني EN AR
TP-07 Track Record & Similar Projects سجل الأعمال والمشاريع المماثلة تأهيل EN AR
TP-08 Risk Register & Mitigation سجل المخاطر وخطة التعامل فني EN AR
TP-09 BOQ Summary & Price Schedule ملخص الكميات والجدول السعري مالي EN AR
TP-10–13 Supporting Forms: Checklist, RFI, Deviations, Handover النماذج المساندة: قائمة التحقق، الاستفسارات، الانحرافات، التسليم إداري EN AR
TP-G1 Drawing Reading Guide (Arch / Struct / MEP) دليل قراءة المخططات (معماري / إنشائي / كهروميكانيك) دليل EN AR
TP-14 Quantity Take-off & Summary Sheet جدول حساب الكميات والملخص كميات EN AR
TP-G2 How to Use the Kit دليل الاستخدام دليل EN AR

03 Downloadable workbooks

EXCEL · ENGLISH
Quantity take-off workbook
Seven linked sheets, 135 live formulas — take-off, summary, BOQ, waste analysis, rates, checks.
EXCEL · ARABIC
مصنّف حساب الكميات
نفس البنية والمعادلات بالنسخة العربية — سبع أوراق مترابطة.

If nothing happens on a phone, open this page in Safari or Chrome (not an in-app browser) and tap the card again. The file downloads as .xlsx and opens in Excel, Numbers or Google Sheets. · إن لم يحدث شيء على الجوال فافتح الصفحة في Safari أو Chrome مباشرة، وليس من داخل تطبيق آخر.

05 Subscription packages

The documents above are complete on their own. The packages add the second edition, the Excel workbook, your own branding and support — and fund the maintenance of the forms. The portal applies the same limits: active tenders and upload space.

Free Trial

Free
no card required

One tender, 25 MB upload, try the whole flow

Starter

$39
per month

One seat, one language, three projects

Professional

$89
per month

Both editions, Excel workbook, your branding

Enterprise

$199
per month

Unlimited seats, custom forms, named support

What differs between packagesFree TrialStarterProfessionalEnterprise
Active tenders in the portal1315unlimited
Upload space25 MB200 MB1 GBunlimited
All 13 forms, both guides and the take-off✓✓✓✓
English edition✓✓✓✓
Arabic edition (RTL)—✓✓✓
Excel workbook—✓✓✓
Your logo on the forms——✓✓
Users / seats115unlimited
Support——1 business day4 hours, named manager
Custom forms to your tender format———✓

🔓 Open MMC Portal Sign in Subscribe Full pricing Compare plans FAQ

Phase 1 — live backend

The portal is no longer a browser-only prototype. It now runs on a real Node/Express server with a SQLite database, bcrypt password hashing and JWT sessions in an httpOnly cookie. Tenders, uploaded files and requests are stored server-side and follow your account across devices, and plan limits are enforced by the server. Project verification: 54/54 integration tests and 35/35 live curl checks pass. Run it with cd server && npm install && npm run migrate && npm start — see server/README.md.

Not yet implemented: automated drawing/PDF quantity extraction (outputs are built from the templates plus tender data), payment (plan changes write straight to the database), and notifications.

Phase 2 — cloud storage & scheduled backups

Files no longer live only on the server disk. A single abstraction with two drivers — local disk and any S3-compatible cloud (AWS S3, Cloudflare R2, MinIO) — is selected by one variable: STORAGE_DRIVER=local|s3. Every upload is stored under users/<id>/tenders/<id>/<uuid>.<ext> and recorded with its SHA-256 checksum and driver, so downloads are served by short-lived signed URLs (5 minutes) only after ownership is verified. A migration script moves existing files to the cloud, verifying the checksum of each object after upload and never deleting the local copy unless you pass --delete-local.

Database backups use SQLite's VACUUM INTO — a consistent copy taken inside a read transaction, safe while the server is running, never a raw file copy. Each backup is gzipped, checksummed, verified by integrity_check and per-table row counts, then uploaded to backups/db/YYYY/MM/ with retention of 7 daily + 4 weekly + 12 monthly. Scheduling runs in-process on node-cron, each run in an isolated child process, and is disabled with SCHEDULER_ENABLED=false. Restore verifies both checksums, compares every table's row count against the manifest, and refuses to overwrite in place without --yes.

Project verification: 54/54 Phase 1 tests still pass, plus 11/11 S3 tests against a live S3-compatible endpoint. An actual backup was restored and all seven tables matched row-for-row. Run the migration and backups with node scripts/migrate-to-cloud.js and node scripts/backup.js — see README.md section 11 for exactly what was not tested against real AWS S3 or R2.